Gold Coast Gateway Stage 1 Coolangatta.
Client Name
Location
CoolangattaProject Date
1st December, 2017 to 22nd December, 2017The project entailed the installation of two screw piered concrete capped footings into the Coolangatta beach sand adjacent to the Gold Coast Airport at Coolangatta along with the hold down bolts to support the 22 two pac painted light poles fitted with multiple outreaches and LED luminaires and all ancillary electrical works.